| Robot and Cell Safety |
ISO 10218-1 and ISO 10218-2; the 2025 editions address industrial robot safety and robot-system integration. |
Whether the complete welding cell—not only the robot arm—has documented risk reduction, safeguarded space, emergency stops, access control, and validated safety functions. |
Risk assessment, safety circuit validation report, safety-layout drawings, emergency-stop test records, and operating instructions. |
Global; commonly referenced for industrial robot installations. |
| Collaborative Operation |
ISO/TS 15066:2016, used with ISO 10218 for collaborative robot applications. |
Whether power-and-force limiting, speed-and-separation monitoring, or hand-guiding functions are genuinely suitable for the welding process and tooling. |
Validated collaborative application assessment, measured stopping performance, force and pressure test results, and documented operating modes. |
Global, where collaborative operation is selected. |
| Functional Safety |
ISO 13849-1:2023 or IEC 62061:2021 with applicable amendments. |
Safety Performance Level or Safety Integrity Level targets for emergency stop, gate interlock, enabling device, reduced-speed mode, and restart prevention. |
Safety calculations, architecture diagrams, component certificates, fault-exclusion rationale, and validation testing. |
Europe, North America, and other markets accepting ISO/IEC functional-safety methods. |
| Electrical Equipment |
IEC 60204-1 for the electrical equipment of machines. |
Correct supply voltage and frequency, protective bonding, overcurrent protection, disconnecting means, control-circuit protection, and enclosure suitability. |
Electrical schematics, short-circuit rating data, protective-conductor test results, insulation tests, and nameplate information. |
Global; local electrical codes may add requirements. |
| Machine Guarding |
ISO 14120 for guards and ISO 14119 for interlocking devices associated with guards. |
Whether fixed and movable guards prevent access to hazardous motion, welding arc radiation, hot parts, sparks, and pinch points. |
Guard design drawings, interlock coding or anti-defeat measures, access-time calculations, and functional tests. |
Global machinery-safety projects. |
| Arc-Radiation Protection |
ISO 16321 series for occupational eye and face protection, together with applicable national workplace requirements. |
Whether the cell uses suitable opaque curtains, screens, viewing windows, warning indicators, and access controls for the welding process. |
Screen material specifications, optical-protection data, layout verification, and workplace exposure assessment. |
Global; requirements vary by process, current, material, and jurisdiction. |
| Fume and Gas Control |
Local occupational-exposure rules; ISO 21904 series addresses fume-capture and filtration equipment for welding and allied processes. |
Capture location, airflow, filter class, extraction alarms, replacement intervals, and compatibility with shielding gases and consumables. |
Airflow measurements, filter specifications, commissioning records, maintenance schedule, and workplace exposure assessment. |
Global, with exposure limits determined by national law. |
| Welding Quality Management |
ISO 3834 series; ISO 3834-2 specifies comprehensive quality requirements for fusion welding of metallic materials. |
Whether the supplier can support welding procedure qualification, consumable control, calibration, traceability, inspection, and corrective action. |
Quality plan, welding procedure specifications, procedure qualification records, welder or operator qualifications, calibration certificates, and inspection records. |
Global fabrication, structural, pressure, and regulated-industry projects. |
| Welding Personnel and Programming |
ISO 14732 for qualification of welding operators and weld setters for mechanized and automatic welding. |
Who is responsible for programming, parameter setup, process supervision, and production release, and whether competence is documented. |
Qualification records, training matrix, approved parameter sheets, programming authorization, and production audit records. |
Global projects using mechanized or automated welding. |
| CE and European Market Access |
EU Machinery Regulation (EU) 2023/1230 applies from 20 January 2027; until then, Machinery Directive 2006/42/EC remains applicable where relevant. |
Whether the supplier has identified the correct conformity route for a complete machine, partly completed machine, or integrated production line. |
EU Declaration of Conformity or Declaration of Incorporation, technical file support, risk assessment, instructions, and CE marking where legally applicable. |
European Economic Area and markets recognizing CE documentation. |
| North American Safety |
ANSI/RIA R15.06 for industrial robot and robot-system safety; NFPA 79 for industrial machinery electrical equipment where applicable. |
Whether the cell design aligns with the authority having jurisdiction, electrical inspection requirements, and site-specific lockout/tagout procedures. |
North American risk assessment, electrical inspection package, lockout/tagout procedure, and documented safeguarding validation. |
United States and Canada; confirm state, provincial, and site requirements. |
| EMC and Industrial Environment |
IEC 61000-6-2 for industrial-environment immunity and IEC 61000-6-4 for industrial-environment emissions, where applicable. |
Whether the welding power source, robot controller, sensors, network devices, and extraction equipment can operate together without harmful interference. |
EMC test reports or declarations, grounding plan, cable-separation rules, and site commissioning test results. |
Global industrial installations; product-specific EMC standards may supersede generic standards. |
| Welding Power and Robot Integration |
Use documented interface specifications; IEC 60974 series covers arc-welding equipment, including power sources and accessories. |
Compatibility of fieldbus or digital I/O, weld-start and weld-complete signals, current and voltage feedback, crater fill, burn-back, gas purge, and fault handling. |
Interface control document, I/O list, communication test, weld-program backup, alarm matrix, and sample production cycle. |
Global; protocol availability must be confirmed for each system configuration. |
| Factory Automation Integration |
IEC 61131-3 for programmable controller programming languages; OPC UA and industrial Ethernet protocols may be used for supervisory integration. |
Whether the cell can exchange recipes, status, alarms, production counts, quality data, and maintenance information with the plant system. |
Network architecture, tag list, protocol map, cybersecurity responsibilities, data-retention plan, and witnessed integration test. |
Global smart-factory and traceability projects. |
| Cybersecurity |
IEC 62443 series for industrial automation and control-system cybersecurity; applicable requirements depend on system scope. |
User authentication, role-based access, secure remote service, software-update control, backup protection, network segmentation, and incident response. |
Cybersecurity concept, account policy, remote-access procedure, patch policy, backup/restore test, and supplier security statement. |
Global connected production environments. |
| Material Handling and Positioning |
ISO 12100 for machinery risk assessment and risk reduction; lifting, guarding, and local workplace rules may also apply. |
Fixture repeatability, part loading safety, workpiece mass, clamping force, collision protection, distortion control, and access for inspection. |
Load calculations, fixture drawings, repeatability results, clamp-failure response test, collision-recovery procedure, and first-article inspection. |
Global manufacturing environments. |
| Documentation and Lifecycle Support |
ISO 12100 principles, applicable conformity legislation, and customer-specific quality-management requirements. |
Availability of manuals, spare-parts lists, electrical and pneumatic schematics, software backups, preventive-maintenance instructions, and training. |
Document register, revision-controlled drawings, backup files, maintenance plan, training records, spare-parts lead times, and service-level agreement. |
Global; documentation should be supplied in the required local language where legally required. |